Sarkhej–Vishala Elevated Corridor: 32 buildings razed for Sarkhej–Vishala elevated corridor | Ahmedabad News

Saroj Kumar
1 Min Read


32 buildings razed for Sarkhej–Vishala elevated corridor

Ahmedabad: The Ahmedabad Municipal Corporation (AMC) on Thursday carried out a demolition drive to clear encroachments along both sides of the national highway stretch from Vishala Circle to Sarkhej, removing a total of 32 structures.The action included the demolition of 23 residential buildings and nine commercial units, officials said.

Ahmedabad: NSE IX Global Access, US Duty Solar Pivot, Heritage Map Expansion And More

The clearance drive is part of preparations for the elevated corridor being constructed by the National Highways Authority of India (NHAI) between Sarkhej and Vishala Circle. The proposed corridor aims to ease traffic congestion and streamline vehicular movement on the busy stretch in the city.AMC officials said residents and occupants had been issued notices and were given a two-month window to voluntarily remove the structures. However, as the occupants failed to comply within the stipulated period, the civic body proceeded with the demolition on Thursday.



Source link

Share This Article
Follow:
Saroj Kumar is a digital journalist and news Editor, of Aman Shanti News. He covers breaking news, Indian and global affairs, and trending stories with a focus on accuracy and credibility.